Asset 13@4x

Mechanical Engineering Dept. NDU

Client: Petroleum Technology Development Fund (PTDF)

Beneficiary: Niger Delta University

Location: Amassoma, Bayelsa State – Nigeria

Description: Construction of Mechanical Engineering Department in the Faculty of Technology NDU Amassoma Completion: 2011 Project Scope: Delivery of the entire Civil Works related component of the mecha- nical engineering department of the NDU. The 2500sqm foot print of the structure comprising of 500 seating capacity Lecture theater, Classrooms, Offices, Laboratories, Rest rooms and Stores. Foundation was a 1.2m deep Raft with retaining walls 2.5m high for erosion control on one side. The 3 floors Structure was completed with metal trusses and 0.75mm Aluminum long Span Roofing Sheets.

Asset 22@4x

Chrisland University Project

Client: Chrisland University

Location: Ogun State – Nigeria.

Description: Construction of Faculty of Basic Medical Sciences. Completion: 2021 Project Scope: A turnkey project which was deliv- ered on 3floors and also comprises of a basement level, with a total floor space area of 2860 sqm, which includes Classrooms, Offices, Laboratories, Rest rooms, Laboratories Equipment, Car Park and all other External Works.

Asset 19@4x

Family Homes Project

Client: Family Homes Funds Limited

Location: Grand Luvu Estate, Nasarawa State – Nigeria

Description: Provision of Four Solar Powered High Yielding Borehole System Completion: 2022 Project Scope: Drilling of 4nos Industrial Borehole with a minimum of 100m (300ft) depth, Casing, Installation of Solar Panels, Submersible Pumps, Control Switch, Complete with all necessary Piping, Reticulation to deliver 75,000liters of water per day. Construction of Storage Tanks and reservoirs with a total capacity of 240,000 litres for use for the 560units of houses within the Estate.

Asset 28@4x

Oyo Water Project

Client: Oyo State Rural Water Supply and Sanitation Agency (RUWASSA)

Location: Olomidu Ibadan- Oyo State -Nigeria

Description: Provision of Solar Powered Boreholes and Storage Tanks

Completion: 2020 Project

Scope: Installation of 2 Nos High yield industrial depth Borehole, complete with solar powered submersible pumps, DC/AC converter control box, overhead tank stanchion, storage tanks, control valves, piping and reticulation. Also included are Tubular Batteries and Inverters for Power Storage and Conversion respectively.